Owners can protect themselves from construction delays with a compensation clause liquidated in their contract. Damage liquidated is a determined amount per day that the contractor pays to the owner for each day the construction is delayed. Instead of suing the court for damages, the owner and contractor may agree in advance for an amount of liquidated damages. If you do not pay according to the date indicated in the agreement, you can pay the fine. Similarly, the contractor is required to pay a penalty if he has not completed the project within the expected time frame. Even if the cost of different types of raw materials increases, the contractor should comply with the contract and it should be delivered on schedule. Planning plans should comply with local regulations and full information should be made available to the owner. Various elements such as building structure, electrical wiring, plumbing, drainage, septic tank, water tanks and gutters, access to the road, landscaping and full description should be included in the agreement, so there will be no ambiguity. Say that your contractor and his or her team have suddenly stopped working, and that he or she is demanding excessive payment for equipment and work that were not originally agreed upon. Or your client, the owner, refuses to pay you once the project is complete. One way or another, you should make sure that you have a written agreement to protect your rights. If you don`t agree, you risk wasting time and money, not to mention the quality of the construction. Before signing a construction contract between the owner and the contractor, it is necessary to ensure that all property is properly covered, so that there is sufficient legal protection.

Risk factors should be included in the contract to protect the interests of the owner. If you do not read the written agreement, you will not be in a defensive position. The supply of products and services is mentioned in the contract between the owner and the contractor. There should be no conflict in the payment method. The method of payment can be made in cash, cheques or electronic transfers in accordance with the reciprocal agreement. The law of the land should be respected so that there are no problems. You can cancel the payment at the end of the month. If you are unable to pay large bills at a time, you can negotiate with the contractor to have the bill paid in increments.

Close Menu